INNOVANZA'25 PRESENTS

SETU NIRMAN

Banner
Banner
SETU NIRMAN

What it’s all about.

Setu Nirman is an exciting and dynamic bridge-building competition that puts your creativity, teamwork, and engineering skills to the test! Using only ice cream sticks and glue, participants must design and construct a bridge that can withstand weight or span a designated distance. With limited resources and a ticking clock, this challenge pushes students to think critically, innovate under pressure, and apply real-world engineering principles in a hands-on environment.
Join us and put your skills to the ultimate test!
roadmap

Flow of Event

Introduction
The participants will be given complete details about the event and its rules, score counting procedure, negatives, and elimination for the smooth conduction of the event
Team Making/Registration
Participants will be making team comprising of 3 - 5 members.
Working Time
Working time can be flexible, Students can design and build their models on their own.
Inspection
After the completion of the working time, Teams will be presenting their models for inspection for Testing Round.
Testing Round
In this round the submitted structure will be tested on basis of its design and load withstanding capability.
Prize Distribution
The team whose structure withstands the maximum weight and does not collapse under simulated conditions will be considered winner. The winning team will be awarded certificates, medals and sponsor rewards.
Banner
Banner

Rules and Regulations

1. This is team event. Each team should have 3 to 5 members

2. The winning bridge will be determined by its ability to hold the largest load.

3. The bridges will be weighted (number of popsicle sticks) before testing. In the case of a tie, the lightest bridge will be declared the winner.

4. Laminating is allowed to make the thin sticks thicker.

5. Bridges are to be constructed before the Inspection Round begins. Bridges will be broken as part of testing.

6. Loads will be applied to the centre of the top side of the bridge.

7. The load will be applied till the bridge is completely broken.

8. The bridges will be loaded from the top, the loading bar will be placed roughly over the center .

9. The use of plastic glue/ hot glue/ glue gun/ Feviquick is strictly prohibited.

10. Any paint or any other coating aside from glue is not allowed

11. Use of prohibited items and ill-treatment with coordinators and jury members may pave the way for your disqualification.

12. Write the name of your team members, branch, year on a slip attached with your bridge.

13.The group leader will be responsible for bringing the bridge for its testing.


Banner

Structural Constraints

1. Bridge length must be in range (min 400 mm – max 500 mm).

2. Bridge width must be in range (min 100mm – max 150 mm)

3. Bridge height must not be greater than 150 mm


Banner

Material Required

1. Each participant, or team will work with maximum 300 popsicle sticks (standard size 4.5 inch).

2. White paper

3. All purpose, nontoxic glue (note: crazy and industrial glue are not permitted). White glue is the only glue permitted (e.g. Fevicol MR, Fevicol SH, Wooden Fevicol).

4. Hot glue (glue gun)/ Feviquick is strictly prohibited.

Banner

Judging Criteria

1. Bridge strength will be tested by the application of the load at its centre till the structure breaks.

2. The bridge withstanding the maximum amount of load will be declared as winner.

3. In case of a tie the bridge with less number of sticks will be given advantage.

4.Unique and innovative designs will be awarded extra points.

Event Coordinators

Member Stick

Swati Singh

+91-7565031914
Member Stick

Anshuman Sengar

+91-9305759127
Member Stick

Rishabh Pandey

+91-7355105354
Member Stick

Shyam Maurya

+91-9336390899
Image

Event Head

Member Stick

Raj Pandey

+91-8115485934
Member Stick

Raj Kamal Pal

+91-8887818484
Image

Participate Now

Banner